Reliable after-sale service
As a worldwide leader in offering the best Construction-Manager test torrent, we are committed to providing comprehensive service to the majority of consumers and strive for constructing an integrated service. What's more, we have achieved breakthroughs in Construction-Manager certification training application as well as interactive sharing and after-sales service. As a matter of fact, our company takes account of every client's difficulties with fitting solutions. As long as you need help, we will offer instant support to deal with any of your problems about our Certified Construction Manager (CCM) guide torrent. Any time is available; our responsible staff will be pleased to answer your questions.
Those who are ambitious to obtain Certified Construction Manager (CCM) certification mainly include office workers; they expect to reach a higher position and get handsome salary, moreover, a prosperous future. Through our Construction-Manager test torrent, we expect to design such an efficient study plan to help you build a high efficient learning attitude for your further development. Our study materials are cater every candidate no matter you are a student or office worker, a green hand or a staff member of many years' experience, Construction-Manager certification training is absolutely good choices for you. Therefore, you have no need to worry about whether you can pass the exam, because we guarantee you to succeed with our technology strength.
Efficient study plan
As a matter of fact, long-time study isn't a necessity, but learning with high quality and high efficient is the key method to assist you to succeed. We provide several sets of Construction-Manager test torrent with complicated knowledge simplified and with the study content easy to master, thus limiting your precious time but gaining more important knowledge. Our Certified Construction Manager (CCM) guide torrent is equipped with time-keeping and simulation test functions, it's of great use to set up a time keeper to help adjust the speed and stay alert to improve efficiency. Our expert team has designed a high efficient training process that you only need 20-30 hours to prepare the exam with our Construction-Manager certification training. With an overall 20-30 hours' training plan, you can also make a small to-do list to remind yourself of how much time you plan to spend in a day with Construction-Manager test torrent.
High pass rate we guarantee
In recent years, our Construction-Manager test torrent has been well received and have reached 99% pass rate with all our dedication. As a powerful tool for a lot of workers to walk forward a higher self-improvement, our Construction-Manager certification training continue to pursue our passion for advanced performance and human-centric technology. A good deal of researches has been made to figure out how to help different kinds of candidates to get Certified Construction Manager (CCM) certification. We revise and update the Certified Construction Manager (CCM) guide torrent according to the changes of the syllabus and the latest developments in theory and practice. We base the Construction-Manager certification training on the test of recent years and the industry trends through rigorous analysis.
CMAA Construction-Manager Exam Syllabus Topics:
| Section | Weight | Objectives |
|---|---|---|
| Topic 1: Risk Management | 10% | - Insurance and liability - Identification and assessment - Monitoring and control - Mitigation and response planning |
| Topic 2: Contract Administration | 10% | - Change order management - Contract types and procurement - Claims and dispute resolution - Negotiation and formation |
| Topic 3: Quality Management | 10% | - Planning and standards - Quality assurance and control - Compliance and audits - Continuous improvement |
| Topic 4: Technology | 5% | - Data management and analytics - Project management software - BIM and digital tools - Emerging technologies |
| Topic 5: Sustainability | 5% | - Resource efficiency - Green building principles - Lifecycle assessment - Environmental compliance |
| Topic 6: Safety Management | 10% | - Regulatory compliance - Incident investigation - Safety planning and training - Hazard identification and control |
| Topic 7: Cost Management | 10% | - Financial reporting - Cost control and forecasting - Estimation and budgeting - Earned value management |
| Topic 8: Program & Project Management | 20% | - Stakeholder management - Project initiation and planning - Lifecycle management - Scope management |
| Topic 9: Professional Practice | 10% | - Legal and regulatory framework - Professional development - Ethics and standards - Leadership and communication |
| Topic 10: Time Management | 10% | - Critical path method - Scheduling techniques - Resource allocation and leveling - Schedule control |
CMAA Certified Construction Manager (CCM) Sample Questions:
Question 1
Construction schedule coordination and enforcement means and methods techniques, and sequence of work are typically assigned to the construction manager under which delivery method?
A. Design-Build (DB)
B. Design-Bid-Build (DBB)
C. Multi-Prime
D. CM at Risk(CMAR)
Question 2
Which of the following statements BEST describes the recommended approach CMs should take with respect to building information modeling (BIM)?
A. The CM should require the owner to use BIM.
B. The CM should not recommend the use of BIM.
C. The CM should not discuss BIM unless requested by the owner.
D. The CM should assure the owner has considered using BIM.
Question 3
Owner's representation staff are managing the construction of a new water treatment plant. The owner has specific operational and sustainability goals they want met and are contracting the team for full commissioning services. The commissioning plan should include which of the following requirements for each party in the commissioning process?
A. Sequencing, scheduling, documentation, verification procedures
B. Budgeting, sequencing, scheduling, documentation
C. Sequencing, scheduling, design review, verification procedures
D. Sequencing, scheduling, startup procedures, verification process
Question 4
The joint between a cast-in-place wall and a cast-in-place roof slab contains a waterstop for a sub-grade structure. While installing roof beams, the waterstop became dislodged from the already-placed wall. A non- conformance report was issued. The engineer of record's repair detail showed to cut and remove the dislodged waterstop sections. The authority/agency re-approved the detail as the waterstop is part of a secondary waterproofing system and the primary system was deemed sufficient. The contractor did not comply with the detail and placed the concrete roof slab over the dislodged material. In this scenario, which of the following options represents the BEST course of action?
A. The concrete should be chopped out, rebar dowels should be drilled into the new slab, and the repair detail should be implemented.
B. The agency should accept as-is and rely on the primary system.
C. All slab concrete should be removed.
D. Based on the engineer of record's recommendation, the contractor should develop a repair detail and submit for approval.
Question 5
During the design phase of a CM agency project, the designer submits several design options for the stakeholders to review and provide input on. Whose responsibility is it to ensure that the stakeholders are able to provide input on the designs?
A. Owner
B. CM
C. Designer
D. Commissioning agent
Solutions:
| Question 1 Answer: D | Question 2 Answer: D | Question 3 Answer: A | Question 4 Answer: D | Question 5 Answer: B |